Employee eNet Sign In

Webpage Search Results

Can't find what you're looking for?
Try our A-Z Website Guide.
Fee Schedule as of October 21, 2015   Class rooms                         Cit...
Water, Power, Sewer, Garbage Rates   Summary of Rate Schedules - St. George, Utah, Municipal Power and Light System Effective February 1, 2014. Residential Service This rate schedule applies to all residential electric service used for domestic purposes on the premises of any individual private residence, apartment, or dwelling and measured by a single meter at approximately 110 or 240 volts, 60 cycles. The common areas of residential developments will be considered residential service if the owners of the common area are exclusive users and if the total connected load for the common area does not exceed 30 kW. Rates Per Meter Per Month Customer Charge $15.65 0-800 kWh, per kWh $0.075053 > 800 kWh, per kWh .08132 Small General ServiceThis schedule is for single or three-phase non-residential service supplied at the Department's available voltage through a single meter for all service required on the Customer's premises with a power requirement that is not greater than 50kW or 10,000 Kwh during any one (1) month of the prior twelve (12) month period. Customers subject to this rate schedule who fail to qualify under the above condition shall be classified as Large General Service regardless of the period of time during which they qualified under this Schedule. Customers otherwise subject to this rate who fail to qualify under the above conditions shall remain on the Large General Service schedule until the next regular review of accounts is completed. Rates Per Meter Per Month Customer Charge $13.55 Energy Charge:   0-1,500 kWh, per kWh $0.083995 Next 8,500 kWh, per kWh $0.091592 Over 10,000 kWh, per kWh $0.106037 Demand Charge:   0-10 kW, per kW $0.00 (See note) Over 10 kW, per kW $9.70 NOTE: If an external commercial and or temporary construction use is not gong to exceed 5 kW in demand, the City will not require a demand meter be placed. This exception is only for services that serve signs, lighting , irrigation timers and miscellaneous outdoor needs and will be approved by Water & Power Engineering Power Factor Adjustment: If the customer power factor is found to be less than 95 percent, the customer will be penalized 1 percent of the overall billing for each 1 percent below the 95 percent power factor. Large General ServiceThis schedule is for single or three-phase non-residential service supplied at the Department's available voltage through a single meter for all service required on the Customer's premises by Customers with a power requirement of greater than 50 kW or 10,000 Kwh during any one (1) month of the prior twelve (12) month period. It is also applicable to any customer who fails to qualify for Small General Service until the next regular review of accounts is completed. Rates Per Meter Per Month Customer Charge $70.68 Energy Charge:   0-10,000 kWh, per kWh $0.061311 Over 10,000 kWh, per kWh $0.046224 Demand Charge:   0-5 kW, per kW $0.00 Over 5 kW, per kW $13.47 Character of service: Alternating current; 60 cycles; single phase 120/240 volts; three-phase 120/208 volts, and other voltages upon permission of the City as specified in service policies and regulations. Power Factor Adjustment: If the customer power factor is found to be less than 95 percent, the customer will be penalized 1 percent of the overall billing for each 1 percent below the 95 percent power factor. Agricultural ServiceThis schedule is for three-phase non-residential service to water pumps that supply water to agricultural projects. Rates Per Meter Per Month Customer Charge $13.55 Energy Charge:   0-1,500 kWh, per kWh $0.08995 Next 8,500 kWh, per kWh $0.091592 Over 10,000 kWh, per kWh $0.106037 Other ServiceTemporary Service: Temporary power will be charge at the Small General Service Rate. Service Outside City Limits: Electric service fees/rates for those connected tot the City Electric System, but living outside the City of St. George incorporated area will be higher than the rates paid by those inside the incorporated area of the City, as determined from time by the City Council. Demand Charge Adjustment: If billing is less than 15 days, the demand charge will be pro-rated. Summary of Rates Schedules - St. George, Utah. Municipal Water System Effective July 1, 2016 Summary of water rates schedules as authorized by ordinance passed by the City Council on July 18, 2016 for service available to customers within the reach of the existing distribution system. General Water Service Rate Monthly Base Charge Meter Size Monthly Charge 5/8 X 3/4" & 3/4" 24.72 1" 52.03 1-1/2" 96.80 2" 186.34 3" 332.15 4" 699.38 6" 1439.90 For the base charges shown above, 5,000 gallons per month may be used by each customer without additional charge. The costs for water used in excess of 5,000 gallons per month are shown below. Consumptive Use Blocks for 3/4" Meters Water Use Per Month Costs Per 1,000 Gallons Used 0-5,000 Included in base charge 5,000-10,000 $1.08 10,000-15,000 $1.20 15,000-20,000 $1.30 20,000-25,000 $1.41 25,000-30,000 $1.52 30,000-35,000 $1.63 35,000-40,000 $1.95 40,000-45,000 $2.50 45,000 and above $2.97 Residential Garbage Rates  $11.50Residential Sewer Rates  $10.68
The St. George 911 Communications Center is the dispatch center for every police, fire and ambulance agency in the county as well as being the 911 center for the public. Thousands of 911 calls ar...
This website has been prepared as a brief introduction to acquaint you with the purchasing procedures of the City of St. George, Utah. Familiarity with these procedures will aid you in marketing your ...
Question:  Where do I find the current City code?                   
Answer:  The current City code can be found here.
<