Employee eNet Sign In

Webpage Search Results

Can't find what you're looking for?
Try our A-Z Website Guide.
...0 kWh, per kWh $0.083995 Next 8,500 kWh, per kWh $0.091592 Over 10,000 kWh, per kWh $0.106037 Demand Charge:   0-10 kW, per kW $0.00 (See note) Over 10 kW, per kW $9.70 NOTE: If an external commercial and or temporary construction use is not gong to exceed 5 kW in demand, the City will not require a demand meter be placed. This exception is only for services that serve signs, lighting , irrigation timers and miscellaneous outdoor needs and will be approved by Water & Power Engineering Power Factor Adjustment: If the customer power factor is found to be less than 95 percent, the customer will be penalized 1 percent of the overall billing for each 1 percent below the 95 percent power factor. Large General ServiceThis schedule is for single or three-phase non-residential service supplied at the Department's available voltage through a single meter for all service required on the Customer's premises by Customers with a power requirement of greater than 50 kW or 10,000 Kwh during any one (1) month of the prior twelve (12) month period. It is also applicable to any customer who fails to qualify for Small General Service until the next regular review of accounts is completed. Rates Per Meter Per Month Customer Charge $70.68 Energy Charge:   0-10,000 kWh, per kWh $0.061311 Over 10,000 kWh, per kWh $0.046224 Demand Charge:   0-5 kW, per kW $0.00 Over 5 kW, per kW $13.47 Character of service: Alternating current; 60 cycles; single phase 120/240 volts; three-phase 120/208 volts, and other voltages upon permission of the City as specified in service policies and regulations. Power Factor Adjustment: If the customer power factor is found to be less than 95 percent, the customer will be penalized 1 percent of the overall billing for each 1 percent below the 95 percent power factor. Agricultural ServiceThis schedule is for three-phase non-residential service to water pumps that supply water to agricultural projects. Rates Per Meter Per Month Customer Charge $13.55 Energy Charge:   0-1,500 kWh, per kWh $0.08995 Next 8,500 kWh, per kWh $0.091592 Over 10,000 kWh, per kWh $0.106037 Other ServiceTem...
Question: What are the hours of the shelter?
Answer: We are open Mon-Fri from 10am to 5:00pm and Saturday 10am-2pm, closed Sunday and Holidays.
...;It wasn't until 1983 that the first full-time Chief was hired.  By 1992, the area had grown large enough to require a full-time staff of firefig...
...ic can affect reproduction and development in humans (Borzysonyi et al., 1992; Desi et al., 1992; Tabacova et al., 1994). After reviewing the available literature on ars...
Spring Pickleball League   Begins:  Week of March 5th Cost:  Early Bird Registration before February 28th - $35 person / each league After February 28th - $45 person / each league...
...a bullet hole in the ceiling.   During the early 1900's to the mid-1920's, the Social Hall was called the "Opera House" because of the many ope...
Description Jr. Development clinics utilize a 75% compressed green dot ball and a 78’ court (full size court) to help players between the ages of 10 and 13 and staying within the parameters of ...
Description Jr. Development clinics utilize a 75% compressed green dot ball and a 78’ court (full size court) to help players between the ages of 10 and 13 and staying within the parameters of ...
Admission   Age Resident Non-Resident Youth (17 & Under) $3.50 $5.00 Adults (18 - 58) $4.00 $6.00 Seniors (59+) $3.50 $5.00 Toddlers (under 3) FREE with p...
  St. George City has awarded Holbrook Asphalt to treat over 3 million square feet of roadways during Fall 2017, beginning September 12, 2017,  and ending mid-OctoberMap to all ro...
When: Friday, January 26th & Saturday, January 27th  Sanctioned: USTA Sanctioned, must be a member of the USTA   Events & Skill:             ...