Employee eNet Sign In

Webpage Search Results

Can't find what you're looking for?
Try our A-Z Website Guide.
Monday, May 6, 2019 at 6:00 pm, Confluence Trailhead   May is national bike month, and to celebrate the City of St. George will be hosting several bike events. One of those events, the bi-...
2019 Fall Brawl Dates Tuesday, October 8th thru Saturday, October 12th   Please visit pickleballtournaments.com for all Pre Registration and Paid Registration Pre Registration begins March ...
...May 30, 2019 @ 4:00-5:00 pm Questions?? Contact Jenny Fidler at 435/627-4592 or email her at jenny.fidler@sgcity.org  Click on the Volunteer Fo...
... be a vinyl coated polyester of equivalent Fabric shall be stitched with #92 polyester threads Banner shall be 29" wide by 96" long A 4" pocket sew...
...0 kWh, per kWh $0.083995 Next 8,500 kWh, per kWh $0.091592 Over 10,000 kWh, per kWh $0.106037 Demand Charge:   0-10 kW, per kW $0.00 (See note) Over 10 kW, per kW $9.70 NOTE: If an external commercial and or temporary construction use is not gong to exceed 5 kW in demand, the City will not require a demand meter be placed. This exception is only for services that serve signs, lighting , irrigation timers and miscellaneous outdoor needs and will be approved by Water & Power Engineering Power Factor Adjustment: If the customer power factor is found to be less than 95 percent, the customer will be penalized 1 percent of the overall billing for each 1 percent below the 95 percent power factor. Large General ServiceThis schedule is for single or three-phase non-residential service supplied at the Department's available voltage through a single meter for all service required on the Customer's premises by Customers with a power requirement of greater than 50 kW or 10,000 Kwh during any one (1) month of the prior twelve (12) month period. It is also applicable to any customer who fails to qualify for Small General Service until the next regular review of accounts is completed. Rates Per Meter Per Month Customer Charge $70.68 Energy Charge:   0-10,000 kWh, per kWh $0.061311 Over 10,000 kWh, per kWh $0.046224 Demand Charge:   0-5 kW, per kW $0.00 Over 5 kW, per kW $13.47 Character of service: Alternating current; 60 cycles; single phase 120/240 volts; three-phase 120/208 volts, and other voltages upon permission of the City as specified in service policies and regulations. Power Factor Adjustment: If the customer power factor is found to be less than 95 percent, the customer will be penalized 1 percent of the overall billing for each 1 percent below the 95 percent power factor. Agricultural ServiceThis schedule is for three-phase non-residential service to water pumps that supply water to agricultural projects. Rates Per Meter Per Month Customer Charge $13.55 Energy Charge:   0-1,500 kWh, per kWh $0.08995 Next 8,500 kWh, per kWh $0.091592 Over 10,000 kWh, per kWh $0.106037 Other ServiceTem...
Question: What are the hours of the shelter?
Answer: We are open Mon-Fri from 10am to 5:00pm and Saturday 10am-2pm, closed Sunday and Holidays.
...;It wasn't until 1983 that the first full-time Chief was hired.  By 1992, the area had grown large enough to require a full-time staff of firefig...
...ic can affect reproduction and development in humans (Borzysonyi et al., 1992; Desi et al., 1992; Tabacova et al., 1994). After reviewing the available literature on ars...
The City of St. George maintains nearly 400 miles of roadway, which equates to about 83 million square feet of pavement. If you would like to report a pothole or request roadway work to be done on you...
Question: What are the payment procedures?
Answer: Your utility bill should be paid by the due date shown on the bill to maintain a good credit standing with the City of St. George Utilities. Payments may be made through the City website at www.sgcity.org, by mail or at the City office located at 175 East 200 North, St. George through either our 24-hour drop box, drive-up from 8:00 a.m. to 5:00 p.m., or in the lobby from 8:00 a.m. to 5:30 p.m. Monday through Friday.  Payments may also be made at the following St. George bank location.   Drop-Off Locations for Utility Payments Cache Valley Bank 294 E. Tabernacle.   If your account is delinquent and scheduled for shut-off, payment must be made at the City office in person.     
PUBLIC NOTICE   ST. GEORGE CITY MUNICIPAL GENERAL ELECTION VOTE CENTER LOCATION   Please be advised that the City of St. George, Utah will hold a municipal election this year. The ge...
Spring Pickleball League Leagues are ladder leagues, where players will be placed on a ladder from the previous weeks score.  Players will be placed into groups of 4 or 5 players.  Playing...
...a bullet hole in the ceiling.   During the early 1900's to the mid-1920's, the Social Hall was called the "Opera House" because of the many ope...
  High School Tennis Academy Description High School Tennis Academy is available for all high school players regardless of your skill level.  Players will have the opportunity to wor...
St. George Doubles Tennis Classic   When: Friday, November 15th & Saturday, November 16th Time:  Friday matches will begin at 5pm (player check in at 4:30pm)   &nb...
  Dates: Wednesday, March 25th thru Saturday, March 28th Ball: TBA   Events: *Please be aware age and skill events may be combined if not enough players *Match times will be ann...
When: Friday, January 25th & Saturday, January 26th  Age:  14+  Events & Skill:             - 3.0 Singles / Mixer      ...
  Description Jr. Development clinics utilize a 75% compressed green dot ball and a 78’ court (full size court) to help players between the ages of 10 and 13 and staying within the parame...
If we must cancel due to weather, the dates will be listed below, we want all of our players and staff to remain safe   12/4 Wednesday PM leagues have been canceled due to weather.  
If we must cancel due to weather, the dates will be listed below, we want all of our players and staff to remain safe     12/4 All Clinics and Liveball is cancelled     &...