City SiteGuide | Search

175 E. 200 N.
St. George, UT
(435) 634-5800
trafficinfo@sgcity.org
Traffic Home
Introduction

Transportation Masterplan Study
Trans. Expo General Comments
Transportation Expo
Traffic Volumes

Click Here


Traffic F.A.Q.






Trans. Expo Comments-Mall Drive Bridge
CONTACT INFORMATION
If you would like to provide comments, ask questions, or be notified when new information is added to the website, send an email to trafficinfo@sgcity.org.
Location
Comments

  • What happened to the Mall Drive extension out to Washington fields? Very needed, especially with future airport.
  • We look forward to this help with traffic relief in the Washington fields area.


Response
Design of the new Mall Drive Bridge is well underway. A river crossing location has been identified and preliminary layout of connecting roads is complete. The plan calls for extension of Mall Drive from Riverside Drive to the Southeast across the Virgin River with a connection to 3000 East. The project schedule calls for design in 2007 and construction in 2008. The city is moving ahead to issue a bond this summer to pay for the proposed improvements.



PROJECT UPDATES

Project updates can be found here.


Capital Projects



Current Projects

Long Term Projects