
| West Dixie Drive |
| Location |
Mathis Bridge to Tonaquint Park |
| Estimated Completion |
Winter 2011 |
| Traffic Control |
Restricted two-way traffic on half of the road. Expect approximately 5 minute delays. |
|
| Red Hills Parkway |
| Location |
Bluff Street to Industrial Road |
| Estimated Completion |
Summer 2012 |
| Traffic Control |
Restricted two-way traffic on half of the road. |
|
| Riverside Drive |
| Location |
400 East to 2450 East |
| Estimated Completion |
Summer 2012 |
| Traffic Control |
|
|
| Virgin River Storm Drain |
| Location |
I-15 to Virgin River at 270 East |
| Estimated Completion |
Spring 2012 |
| Traffic Control |
|
|
| East Dixie Drive |
| Location |
Convention Center Drive to Riverside Drive |
| Estimated Completion |
Summer 2012 |
| Traffic Control |
|
|
| Mathis Bridge |
| Location |
Dixie Drive at Mathis Park |
| Estimated Completion |
Winter 2012 |
| Traffic Control |
|
|
| 1450 South |
| Location |
Stone Cliffs to 3000 East |
| Estimated Completion |
Spring 2012 |
| Traffic Control |
|
|
|