Bid Details
| Open Bid Information |
| Bid Number |
04-1780 |
| Open Date |
11/1/04 |
| Close Date |
11/23/04 |
| Description |
Water Reuse Pipeline Project |
| Cost Estimate |
|
| Awarded To: |
George W. Johansen Constn. |
| Details |
Sealed bids will be accepted until 4:00 p.m. on November 17, 2004.
The bid schedule is for the construction of an irrigation pipeline from the St. George Wastewater Treatment FAcility to the Sunbrook Golf Course area. Approximately 31,000 lineal feet of 24-inch diameter irrigation pipe is to be installed. The pipeline will bid as Pressure Calss 200 Ductile Iron pipe, with a section of epoxy lined & coated steel pipe for the bridge crossing Dixie Drive.
There is a mandatory pre-bid metting and site visit scheduled for November 15, 2004 at 9:00 a.m., which will originate from the St. George City Water Department Offices located at 175 East 200 North, St. George, UT.
|
| Final Bid Information |
Condie Construction $3,399,966.00 George W. Johansen $2,930,140.08 Interstate Rock Prod. $3,645,367.45 |
|
|
|