Building Permit/Final Inspection Status |
| Name |
[Blackberry Court -Phase 2] |
| Number |
Grading-43616 |
| Drawing of Record Submitted |
3/05/2012 |
| Electronic Drawing
of Record Submitted |
3/05/2012 |
| Final Grading Report
Submitted |
3/05/2012 |
| Date Scheduled |
3/8/2012 |
| BUILDING
PERMIT RELEASE APPROVALS |
| Power |
|
| Water |
|
| Waste |
|
| Engineering |
|
| City Development Engineer |
|
| Landscaping |
|
| FINAL
INSPECTION RELEASE APPROVALS |
| Power |
|
| Water |
3/7/2012 Corrections required per Kevin Condie..1. Meter setter on lot#7 and phase 3 by hydrant setter need to be centered in box. 2. 2 setters on lot 11 arc 1" and boxes are 3/4 need 1" boxes looking for some from Sholzens need to be traffic rated
3/9/2012 Approved per Kevin Condie
1/24/2013 Approved per Kevin Comdie.. 1 year wrranty.. Nolan ok w/1" setter in 3/4 heavy boxes |
| Waste |
3/9/2012 Approved per Lee Kell |
| Engineering |
3/12/12 approved per Brandon W.
1/07/2013 Approved per Brandon Wright .. 1 Yr Warranty |
| City Development Engineer |
3/13/2012 Approved per Wes Jenkins
1/07/2013 Apporved Per Brandon Wright 1 yr warranty |
| Landscaping |
3/13/2012 Approved per Wes Jenkins
1/07/2013 Approved per Breandon Wright |