     Building Permit/Final Inspection Status     About St. George     Building Permit/Final Inspection Status


Building Permit/Final Inspection Status
Building Permit/Final Inspection Status
Name   [Silkwood Phase 3]
Number   Grading-41342
Drawing of Record Submitted   4/25/2012
Electronic Drawing of Record Submitted   4/25/2012
Final Grading Report Submitted   4/27/2012
Date Scheduled   4/30/2012


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power  
Water   5/2/12 approved per Kevin C. 4/8/13 - 1 year warranty approved per Kevin C.
Waste   4/30/2012 Corrections required per Lee Kell.. Belly out side MH, and in line main is dirty 6/29/2012 Approved Per Keith Bacon
Engineering   5/1/12 corrections required per Brandon W. need bond in place with city. 6/28/2012 Approved per Brandon Wright 4/09/2013 Approved per Brandon W.. 1 yr warranty
City Development Engineer   6/28/2012 Approved per Wes Jenkins 4/09/2013 Approved per Brandon W.. 1 yr warranty
Landscaping   6/28/2012 Approved per Wes Jenkins 4/09/2013 Approved per Brandon W. 1 yr warranty


General Comments