Building Permit/Final Inspection Status
Building Permit/Final Inspection Status
Name   [Sun River Phase 29]
Number   Grading-40853
Drawing of Record Submitted   5/26/2009
Electronic Drawing of Record Submitted   5/26/2009
Final Grading Report Submitted   5/26/2009
Date Scheduled   5/28/2009


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power  
Water   6/2/2009 Corrections required per Kevin Condie.. Need to check all meter boxes & stetter for water. 2. Turn all valves. 3. Wire - ok 4. Clean & Paint Fire Hydrants 6/15/2009 Approved per Kevin Condie 6/7/2010 Approved per Darrin Judd.. 1 year warranty.. wire good
Waste   5/28/2009 Approved per Glen Glarland.. Sewer ok 6/7/10 - 1 year warranty - approved per Glen Garland.
Engineering   6/8/2009 Approved per Carlos Robles 5/7/2010 Approved per Brandon Wright 1 year warranty
City Development Engineer   5/29/09 corrections required per Cathy H. Provide private development improvement certificate. Electronic DWG of record - provide top and bottom of retaining wall elevations. Provide size, type of pipe, slope etc on storm drain lines. Letter from Rosenberg about adequacy of Atkinville Wash improvements. per Ken B. Missing end of road markers at knuckle end of Heatherglen Drive. 7/6/09 approved per Cathy H. 5/5/10 - 1 year warranty - approved per Cathy H.
Landscaping   5/29/09 corrections required per Ken B. Common area park is missing at knuckle on Heatherglen Drive. Other landscape missing at knuckle and on slope at hole 9 (Atkinville wash landscaping). 7/6/09 approved per Cathy H. 5/5/10 - 1 year warranty - approved per Ken B.


General Comments