Building Permit/Final Inspection Status |
| Name |
[Tonaquint Valley Phase 2] |
| Number |
Grading-39095 |
| Drawing of Record Submitted |
2/9/2009 |
| Electronic Drawing
of Record Submitted |
2/9/2009 |
| Final Grading Report
Submitted |
2/9/2009 |
| Date Scheduled |
2/10/2009 |
| BUILDING
PERMIT RELEASE APPROVALS |
| Power |
|
| Water |
|
| Waste |
|
| Engineering |
|
| City Development Engineer |
|
| Landscaping |
|
| FINAL
INSPECTION RELEASE APPROVALS |
| Power |
2/17/2009 Approved per Dennis Wright
1/28/2010 Approved per Dennis Wright.. 1 year warranty |
| Water |
2/9/2009 Approved per Kevin Condie
2/1/10 - 1 year warranty - CORRECTIONS REQUIRED per Kevin C. May have water or storm drain leak. (2) sidewalk areas are dropped by meter boxes.
2/11/2011 Approved per Kevin Condie.. 1 year warranty |
| Waste |
2/10/2009 Approved per Glen Garland
1/29/10 - 1 year warranty - CORRECTIONS REQUIRED per Glen G. Road sinking around 1st M/H on 1200 W. Road sinking over sewer line on 2130 S and 1277 W.
2/11/2011 Approved per Glen Garland.. 1 year warranty |
| Engineering |
2/10/2009 Corrections required per Brandon Wright.. Monuments not in and stamped, finish rock walls per plan
2/1/10 - 1 year warranty - CORRECTIONS REQUIRED per Brandon W. Pads need to be finished. Rock walls need to be finished. Road failing.
2/11/2011 Approved per Brandon Wright.. 1 year warranty |
| City Development Engineer |
2/10/2009 Corrections required per Cathy H.. 1. 10% Warranty Bond, 2. rock wall certifications, 3. Electronic Dwg of record need to show all walls in developemnt as-constructed.
2/1/10 - 1 year warranty - CORRECTIONS REQUIRED per Cathy H. Pads need to be finished. Rock walls need to be finished. Road failing.
2/14/2011 Approved per Brett Bingham.. 1 year warranty |
| Landscaping |
2/9/2009 Approved per Larry Shane
2/1/10 - 1 year warranty - approved per Ken B. |