Building Permit/Final Inspection Status |
| Name |
Arrowhead Canyon Bridge(Sun River) |
| Number |
Tracking-38829 |
| Drawing of Record Submitted |
|
| Electronic Drawing
of Record Submitted |
|
| Final Grading Report
Submitted |
|
| Date Scheduled |
|
| BUILDING
PERMIT RELEASE APPROVALS |
| Power |
|
| Water |
|
| Waste |
|
| Engineering |
|
| City Development Engineer |
|
| Landscaping |
|
| FINAL
INSPECTION RELEASE APPROVALS |
| Power |
|
| Water |
5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve. |
| Waste |
5/29/2007 Corrections required per Lee Kell.. Need test on sewer main, finish installing main.. not ready |
| Engineering |
|
| City Development Engineer |
5/29/2007 Corrections required per Jay Sandberg.. Bridge structure only-see report from Engineer and Landmark testing. Drawing of record to be submitted when asphalt,railing, and rip-rap is complete with subdivision |