City of St. George on TwitterCity of St. George on FacebookCity of St. George on YouTube






















Loading

     Building Permit/Final Inspection Status     About St. George     Building Permit/Final Inspection Status


Building Permit/Final Inspection Status
Building Permit/Final Inspection Status
Name   Arrowhead Canyon Bridge(Sun River)
Number   Tracking-38829
Drawing of Record Submitted  
Electronic Drawing of Record Submitted  
Final Grading Report Submitted  
Date Scheduled  


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power  
Water   5/31/07 corrections required per Kevin Condie. Need as-build. Pressure test line, BacT line and collar valve.
Waste   5/29/2007 Corrections required per Lee Kell.. Need test on sewer main, finish installing main.. not ready
Engineering  
City Development Engineer   5/29/2007 Corrections required per Jay Sandberg.. Bridge structure only-see report from Engineer and Landmark testing. Drawing of record to be submitted when asphalt,railing, and rip-rap is complete with subdivision
Landscaping  


General Comments