Name   [Bloomington Commercial - Klein Retail]
Number   Grading-37851
Drawing of Record Submitted   03/12/2007
Electronic Drawing of Record Submitted   03/12/2007
Final Grading Report Submitted   03/12/2007
Date Scheduled  


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power  
Water   03/19/2007 Approved per Wayne M.. Only water is 2" meter next to fire hydrant. 03/19/2007 Approved per Zene(Irrigation)N/A 3/10/2008 Approved per Kevin Condie.. 1yr warranty
Waste   03/21/2007 Approved per Glen Garland
Engineering   03/20/2007 Corrections required pre Brandon Wright.. Broken sidewalk on City right of way. Tire tracks on sidewalk. Stop signs not up. 03/21/2007 Approved per Brandon Wright
City Development Engineer   03/19/2007 Corrections required per Cathy H.. Elec dwg of record-needs to be in the state plane (NAD 83) system to fit into city gis system. Per Ken B- Curb at corner needs R/R asphalt spawling, construction dumpster still on site, pallets stacked next to building in front, sidewalk needs R/R. 03/22/2007 Approved per Cathy H. With the condition that the electronic drawing of record will be received by Monday March 26,2007 no later than 5:00 p.m. in the correct cordinate system. 2/7/08 - 1 year warranty - check landscaping only - approved per Ken B.
Landscaping   03/19/2007 Approved per Ken Bricker 2/7/08 - 1 year warranty - check landscaping only - approved per Ken B.