Building Permit/Final Inspection Status |
| Name |
[Fort Pierce(BA Robison) #70] |
| Number |
Grading-36916 |
| Drawing of Record Submitted |
05/16/2007 |
| Electronic Drawing
of Record Submitted |
05/16/2007 |
| Final Grading Report
Submitted |
05/16/2007 |
| Date Scheduled |
05/17/2007 |
| BUILDING
PERMIT RELEASE APPROVALS |
| Power |
|
| Water |
|
| Waste |
|
| Engineering |
|
| City Development Engineer |
|
| Landscaping |
|
| FINAL
INSPECTION RELEASE APPROVALS |
| Power |
|
| Water |
5/21/2007 Approved Per Wayne M.
4/21/2008 Approved Per Carson Tait.. 1 yr warranty |
| Waste |
05/17/2007 Approved per Travis S.
6/10/2008 Approved per Lee Kell. 1 yr warrnty |
| Engineering |
05/17/2007 Corrections require dper Carlos Robles.. Finish project and clean up site
5/24/2007 Approved per Carlos Robles
6/8/07 approved per Carlos Robles.
4/3/2008 Apprpved per Brandon Wright.. 1 yr warranty |
| City Development Engineer |
5/19/07 corrections required per Cathy H - Provide electronic dwg of record in autocad (dwg) format on the city HCN coordinate system. Per Ken B - general cleanup needed. Construction still in process. Spauling and pitting of asphalt.
5/31/07 approved per Cathy H. |
| Landscaping |
05/19/2007 Corrections required per Ken Bricker.. Clean up site
5/21/07 approved per Ken B. |