     Building Permit/Final Inspection Status     About St. George     Building Permit/Final Inspection Status


Building Permit/Final Inspection Status
Building Permit/Final Inspection Status
Name   [Gordon Palmer Auto Center]
Number   Grading-33754
Drawing of Record Submitted   01/12/2006..07/11/2006
Electronic Drawing of Record Submitted   01/17/2006
Final Grading Report Submitted   01/17/2006
Date Scheduled   01/24/2006..07/13/2006


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power   01/25/2006 Approved per Dennis Wright 7/123/06 Approved - BLDG #2 - per Dennis Wright. 12/5/06 1 year warranty Approved per Dennis Wright. 6/5/07 1 year warranty approved per Dennis Wright.
Water   01/26/2006 Approved per Kevin Condie.. 1. Western Rock is going to raise valve and collar valve box.2. Record of Drawing, 3. FINAL FOR ONLY AUTO SALES UNIT. 4. Will have to have Final on the rest of project 07/13/2006 Corrections required per Darrin..Gave a punch list to contractor 7/13/06 Approved - Bldg #2 - Darin Judd 07/20/2006 Approved per Kevin Condie BLdg 2 6/7/07 - 1 year warranty - approved per Dustin Bracken.
Waste   01/24/2006 Cleanout @ sales center needs dirt-cleaned from around cap for removal and Insp.Both sewer manholes in project need to be cleaned and pipes grouted prior to letting live sewer from sales office into it. 01/25/2006 Approved per Glen Garland.. FOR SALES OFFICE ONLY..Final ok 7/13/06 - BLDG #2 - Approved per Glen Garland. 12/18/06 1 year warranty approved per Glen Garland.
Engineering   01/24/2006 Corrections required per Larry Henderson.. Complete sidewalk drain, remove forms from hydrant pad, remove handicap ramps,redo subgrade to make 95%, redo drawing of record, clean sidewalk and street 01/26/2006 Approved per Larry Henderson 1/2/07 1 year warranty - Corrections required per Brandon Wright. Broken sidewalk done by sign installers drilling holes needs to be repaired - marked in orange paint. 6/6/07 1 year warranty corrections required per Brandon Wright. Broken walk on 1600 S. Secure lid on drain box.
City Development Engineer   01/30/2006 Approved per Cathy H.. AUTO SALES ONLY.. Rest of the project needs to be completed before any other buildings occupied. 07/14/2006 Approved per Brett B. ..Build #2 12/26/2006 Approved per Cathy H.. 1 year warranty 6/5/07 1 year warranty - corrections required - per Ken B. Inspected only public street areas. Sidewalk and curb cracked/broken at corner of 1600 S Blackridge. Curb shoulder has chips broken out.
Landscaping   01/25/2006 Corrections required per Ray Snyder..Inspected for one Bldg only.1. Landscaping to match landscape plan. ALso street trees missing. 2. Open trench in front sidewalk. 3. First lighting check on 1-19-06 and failed, only 3 pole lights on to check, 8 were off. The lights on exceeded approved levels by City Council. 4. Second lighting check on 1-24-06 and failed, no light on. 01/31/2006 Approved per Ray Synder 07/14/2006 Approved per Brett...Build #2 12/26/2006 Approved per Cathy H. 1 year warranty 6/5/07 1 year warranty - corrections required - per Ken B. Inspected only public street areas. Sidewalk and curb cracked/broken at corner of 1600 S Blackridge. Curb shoulder has chips broken out.


General Comments   01/24/2006 Rcvd. from Agec.. footing/Compliance letter