Building Permit/Final Inspection Status |
| Name |
Sun Chase Business Park |
| Number |
Grading-34564 |
| Drawing of Record Submitted |
05/01/2006 |
| Electronic Drawing
of Record Submitted |
05/01/2006 e-mail |
| Final Grading Report
Submitted |
05/18/2006 |
| Date Scheduled |
05/23/2006 |
| BUILDING
PERMIT RELEASE APPROVALS |
| Power |
|
| Water |
|
| Waste |
|
| Engineering |
|
| City Development Engineer |
|
| Landscaping |
|
| FINAL
INSPECTION RELEASE APPROVALS |
| Power |
|
| Water |
5/24/06 Approved per Tim Dotson |
| Waste |
05/23/2006 Corrections required per Lee Kell. 1. Clean MH, one MH is plugged-4. 2. New Drawing of Records-C/0 location have changed from prints. 3. Inverts are too rough. 5/31/06 Corrections required per Lee Kell. Need new drawing of records. Clean MH. 6/6/06 Approved per Lee Kell |
| Engineering |
06/06/2006 Approved per Carlos Robles |
| City Development Engineer |
5/25/06 Correction required per Ken B for Jay Sandberg - Tools and materials laying in driveway at the South end of building. Missing caps on sp rinkler system hookup. Missing solid steel doors on dumpster enclosure. Missing parking bumpers next to building. 6/5/06 Approved with conditions per Jay Sandberg. All areas not complete. Bldg. C approved. CO inspection required for each building. |
| Landscaping |
5/25/06 Correction required per Ken B for Jay Sandberg - Landscaping is incomplete accros the front of the lot, at River Road and along South end. 6/5/06 Approved with conditions per Jay Sandberg. All areas not complete. Bldg. C approved. CO inspection required for each building. |