Name   [Luce Del Sol]
Number   Grading- 32933
Drawing of Record Submitted   04/12/2006
Electronic Drawing of Record Submitted   04/12/2006
Final Grading Report Submitted   04/12/2006
Date Scheduled   04/18/2006


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power   04/21/2006 Approved per Dennis Wright 5/7/2008 Approved per Dennis Wright.. 1 yr warranty
Water   04/18/2006 Corrections required per Kevin Condie.. 1. Need to check wire, 2. 335 South stub street needs cap on water line. 3. 280 South stub street needs cap on water line.4. Arrow and line size in valve collars 5. Valves in Sunbrook Drive need to be broke out and turned on. 4/27/2006 Approved per Kevin Condie 7/14/2008.. 1yr warranty..Wire good-TD
Waste   04/18/2006 Corrections required per Glen Garland.. Missing M/H between bldg's in Bella Terraza.. M/H full of water-has plug in line 04/24/2006 Approved per Glen Garland.. Sewer ok-Final passed 5/5/2008 Approved per Glen Garland.. 1 yr warranty
Engineering   04/25/2006 Corrections required per Carlos Robles.. Clean out Storm drain boxes, grout and cut extra pipe W storm drain boxes, patch chipped crub, grading report. 6/15/06 Approved per Carlos Robles. 5/7/2008 Corrections required per Brandon Wright. 1yr warranty.. Road is moving needs to be repaired. hold 1 year warranty. 12/9/10 - WARRANTY INSPECTION - corrections required per Brandon W. Asphalt repair is failing.
City Development Engineer   4/26/06 - Corrections required per Cathy H. Hillside compliance letter. DWG of record needs to be in DWG format. Rock wall certification letter. 6/14/2007 Approved per Cathy H. 5/6/08 - 1 year warranty (- corrections required per Ken B - Large Cracking at Road crown and at 280 S access entrance.
Landscaping   4/26/06 - Approved per Cathy H. 5/6/08 - 1 year warranty (- corrections required per Ken B - Large Cracking at Road crown and at 280 S access entrance.


General Comments   Hillside Dev. Permit approved by: PC on 7/27/04 and CC on 8/5/04. Grading permit issued on 11/24/04. Cashiers check in the amount of $22,989.00 submitted for Restoration Bond. Conditions of permit include; 1)environ-mental fence installed along limits of cut/fill lines, 2)Heavy equipment not to get onto paved roadways ie. Sunbrook Dr. 3) Hillside Ordinance requirements to be followed.