Name   [Bryce Christensen Adj. To Flying "J"]
Number  
Drawing of Record Submitted  
Electronic Drawing of Record Submitted  
Final Grading Report Submitted  
Date Scheduled  


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


General Comments   11/24/03 Bryce C. has inquired several times over the past couple of years about getting a grading permit for this site which is immediately adjacent (East) of the Flying "J" Truckstop at the Bloomington Interchange. This site is in the Hillside Overlay Zone and requires a Hillside Development Permit. The HRB visited the site on 12/6/01 for review and comment on submittals for formal consideration of a Hillside Development Permit. To date application has not been made for consideration of a permit by the HRB. City is considering a roadway through the property to access the 3D Commercial Development to the North! Bryce's parcel is narrow in width now. With a roadway using part it may be difficult to do legitimate development on the site. Property to the East is BLM Land.