Building Permit/Final Inspection Status
Building Permit/Final Inspection Status
Name   Springs Phase VI, The
Number   Grading 29601
Drawing of Record Submitted  
Electronic Drawing of Record Submitted  
Final Grading Report Submitted  
Date Scheduled  


BUILDING PERMIT RELEASE APPROVALS
Power  
Water  
Waste  
Engineering  
City Development Engineer  
Landscaping  


FINAL INSPECTION RELEASE APPROVALS
Power  
Water   10/14/2003 Correction Required per Jeff Lance. Need W marked in c urb on all lots. Straighten fire hydrant to street. Clean concrete out of box on lot 78. Valves need arrows and 4" line needs to e marked 4" in concrete. Turn meter box lids to street. 10/22/2003. Approved Per Kevin Condie - very good job - thank you.
Waste   10/14/2003. Correction required per Zene. S-marks missing on all lots. 10/22/2003. Approved per Zene.
Engineering   10/14/2003 APPROVED per Mike Hester.
City Development Engineer   10/14/2003 Approved per Judd.
Landscaping   10/15/2003. Approved per Lynne Scott -- no street trees required as this phase has no frontage on 1450 S per Russ Jenson.


General Comments